Facilities

Facilities

From steel coil to finished racking, all in our own plants.

At our Nanjing and Zhenjiang bases, CNC cutting, roll forming, robotic welding, shot blasting and powder coating are all done in-house, keeping quality and lead times under our control.

Production process

Every upright and beam goes through the same process.

  1. 01

    CNC cutting

    Steel coil is cut and punched to design dimensions.

  2. 02

    Roll forming

    Uprights and beams are formed in a single pass on roll-forming lines.

  3. 03

    Robotic welding

    Automated welding ensures consistent welds.

  4. 04

    Shot blasting

    Removes mill scale for better coating adhesion.

  5. 05

    Powder coating

    Electrostatically sprayed and cured for corrosion and wear resistance.

  6. 06

    Inspection and packing

    Inspected before dispatch and packed to export standards.

Inside our plants

Production lines and equipment.

OTL Industrial Centre (Zhenjiang)

Facility overview.

Floor area
32,000 m² (4 floors × 8,000 m²)
Clear height
6 m on the ground floor, 4 m on upper floors
Goods lifts
2 × 5 t, 2 × 3 t
Floor loading
To national light-industry building standards
Dock height
1.45 m

[TBC] Area, production lines and capacity of OTL Technology Centre (Nanjing).

FREE LAYOUT REVIEW

Book a plant visit.

Tell us your preferred date in the form and an engineer will host your visit.

  • Reply within one business dayHandled directly by an engineer, not passed on by a call centre.
  • Free preliminary layoutAttach your floor plan (PDF / DWG) and we’ll assess it.
  • Talk to us directlyTel +852 2615 1488 · WhatsApp

    PDF, DWG, DXF, JPG or PNG, up to 10 MB

    © OTL Systems (Donglian Warehousing Equipment Co., Ltd.)